T: 01293 804530

HomeServicesAboutCase StudiesReporting PortalContact Us

Case Studies

Project PlanNing

ALIGN JV (HS2) - Launching Girder

Safety Check Engineering Ltd (SCE) undertook the thorough examination, witnessing of load testing, commissioning and further thorough examination and issued the ROTE (Report of Thorough Examination) of the first Launching Girder that has been in the UK for a considerable period of time.

Read more
Project PlanNing

BYLOR JV (Hinkley Point)

Safety Check Engineering Ltd (SCE) undertake the thorough examinations of 50+ Tower Cranes, 20+ Crawler Cranes and other Lifting equipment.

Read more
Project PlanNing

St James Phases 1, 2 & 3 White City

Safety Check Engineering Ltd (SCE) undertake the thorough examinations of Tower Cranes, Construction Hoists, Mast Climbing Work Platforms (MCWP), Monorails and Lifting Equipment/Accessories.

Read more
Project PlanNing

Select Plant Hire Olympia

Thorough examination of the tower/crawler cranes, construction hoists and temporary suspended access systems (Cradles). Several tower cranes have been climbed in excess of 100m and SCE have attended to thoroughly examine the climbing frames prior to the climb and subsequently after the climb.

Read more
HomeServicesAboutCase StudiesContactTerms & Conditions
Website by Icon Digital Services
Copyright Safety Check Engineering 2022
Privacy Policy